What is essentially a wasteland? The non technical definition of wasteland from the Cambridge Advanced Learner’s Dictionary is ‘An empty area of land, especially in or near a city, which
Every Obligated Entity should have met its Renewable Purchase Obligations (RPO) target by their own generation or procurement of power from Renewable Energy generator or by the way
Each Renewable Energy Certificate (REC) issued shall represent 1 MWh of electricity generated from renewable energy source and injected into the grid. The price of Certificate shall be
There is standard procedure from the accreditation to the issuance of REC’s. Trading would be supported by the exclusively assigned Power Exchanges. Every RE generating entity requires to
Forest is a sink of carbon. Immense potential of carbon mitigation through the carbon sequestration process, Land Use and Land Use Change (LULUCF) projects are globally introduced. On 11
(Note: CDM Projects status as on April 2011) The CDM is dynamic mechanism introduced by the Kyoto Protocol, allows a country with GHG emission reduction commitment or targets
An introduction to Renewable Energy Certificate (REC) mechanism National Action Plan on Climate Change (NAPCC) and EA (Energy Act)-2003 provide a roadmap for increasing the share of renewable energy
The energy sector holds the key in accelerating the economic growth of India. The energy demands for developing country like India keep on continuously growing. Energy is a
As per the IPCC fourth assessment report on climate change, situation is getting worst as time moving ahead. Through the direct observations of changes in temperature, sea level
As per the IPCC fourth assessment report on climate change, situation is getting worse as time passes. Through the direct observations of changes in temperature, sea level and